Scope of Services
ADANA VILLA Number 1
A – SHELL CONSTRUCTION PHASE
Required earth excavation for the foundation slab
Storage of topsoil on the property
Foundation: Concrete slab made of reinforced concrete
– 30 cm of water-resistant concrete
– Replacement of the soil foundation with a 50 cm thick tamponage
– 2 layers of reinforcement steel mats and foundation beams
– PVC-Nylon cover
B – GROUND FLOOR & UPPER FLOOR
– Support columns made of reinforced concrete
– Walls made of grid blocks
– Reinforced concrete slab with a thickness of 15 cm
– Double layer of reinforcement mats over the walls
B – ROOF
– Gable wall masonry
– Wooden roof structure with beams 10 cm x 12 cm
– ”Continental Plus” roof tiles in brown
– Sheet metal work: White gutters
C – FINISHING PHASE: All points include material, installation, connection, and commissioning
– Electrical connections, power supply, and electricity meter
– Windows and exterior doors made of PVC; manufacturer ”SALAMANDER,” including roller shutters and mosquito nets
– Exterior walls clad with facade system
– Thermal insulation made of polystyrene; thickness 5 cm of the ”MAXIMA” brand
– Electrical installation according to the project (furniture plan), including switches, distribution boards, fuse box, and outlets (option: positions freely selectable)
– Sanitary installation according to the project (option: element positions freely selectable)
– Interior walls plastered with cement-based plaster (rough and fine plaster layers)
– Interior rooms painted white, or tinted as desired
– Interior doors made of MDF or PVC, based on selected and provided samples
– Floor screed with a thickness of 5-6 cm
– Floor coverings made of ceramic tiles (15.00 €/m², selection from 5 designs)
– Bathroom walls fully tiled with ceramic tiles (15.00 €/m², selection from 5 models)
– Waterproofing of bathrooms and terraces (2-component waterproofing)
– Built-in flush cisterns from the ”GROHE” brand, linear floor drains, and a fixed glass partition wall in the shower
– Railing on the upper terrace: half concrete, half glass
– Drilling of a well and installation of a 4 bar water pump for water supply
– Laying of a fiber optic cable for the internet connection from M:TEL
– Installation of four single inverter air conditioners
– Construction of a biological wastewater treatment plant (2.00m x 2.50m)
– Installation of complete sanitary facilities in the bathrooms (standard)
– Installation of two 80-liter water heaters
– Construction of a walkway around the building (1.00m wide)
– Interior stair railing made of wrought iron, glass, or aluminum (optional)
– Veranda tiled and equipped with stairs on 2 sides
D – COMPLETION DEADLINE
– Minimum: March 15, 2025
– Maximum: June 15, 2025